Home/Compare Tools/ClickUp vs Teamwork
Project Management comparison

ClickUp vs Teamwork (2026): Agency Costs & Client Access

Compare ClickUp vs Teamwork for agencies: current pricing, guest-seat costs, billable time limits, profitability, client permissions, and migration checks.

Updated October 30, 202624 min read
People working at computer desks in a shared office, illustrating the agency work discussed in this ClickUp versus Teamwork comparison
ClickUpvsTeamwork

Photo: Austin Distel / Unsplash.Photographed at Proof Technologies (useproof.com), not a ClickUp or Teamwork office. Free Unsplash license verified October 30, 2026.

Key takeaways

1

Current plans matter: ClickUp Core/Business are $9/$17 per user/month on annual billing. Teamwork Basics/Accelerate are $9.99/$24.99; Optimize is custom-priced, not an old Scale quote.

2

Five staff plus twenty commenting clients cost $81/month equivalent on ClickUp Core or $85 on Business. The guest allowance, not just employee count, determines the paid-seat budget.

3

Teamwork client licenses are free on paid plans but limited to five active projects per client user. Collaborators can complete assigned tasks, but cannot log time.

4

Unlimited basic time tracking does not mean unlimited billable tagging or approvals. ClickUp's new Business excludes approvals; Teamwork approvals and financial profitability require Optimize or Enterprise.

5

A financial report can expose cost rates indirectly. Verify client access to tasks, documents, messages, budget data and exported reports separately.

6

Migration is asymmetric: ClickUp uses CSV from Teamwork; Teamwork's ClickUp importer omits folder-less Lists, custom fields, attachments and comment replies, and maps members to collaborators.

Softora verdict

ClickUp for flexible delivery workflows; Teamwork for a properly priced client-finance workflow

Shortlist ClickUp when configurable tasks, docs and cross-project views matter most and your time-billing system is already defined. Shortlist Teamwork when client collaboration, time budgets and invoicing should share one project record; obtain an Optimize quote for financial budgets, profitability and timesheet approvals. ClickUp's cheapest tier is not automatically the cheapest with many interactive guests, and Teamwork's free client users do not replace paid contractors or remove their five-active-project limit. Neither platform was hands-on tested for this comparison.

Flexible work management with guest allowances

ClickUp

Agencies that want configurable delivery workflows, docs and dashboards, can govern client sharing, and have verified the exact time-tracking and finance workflow on their plan.

Current dollar list prices: Core $9/user/month billed yearly or $12 monthly; Business $17 yearly or $25 monthly. Interactive guest overages can create paid member seats. Enterprise is quoted; MAX is $100 yearly or $120 monthly.

Strengths

  • Configurable task hierarchy, docs, views and templates
  • External guests can work on selected content with appropriate permissions
  • Documented task, attachment and time-entry export routes

Watch for

  • Basic tracking, advanced billable features and approvals have different limits
  • Guest overages and same-domain member classification can change the bill
  • Core List exports are a trial; a task spreadsheet is not a complete financial migration
Read full review

Client delivery with plan-gated financial controls

Teamwork

Client-service teams that need project-linked time, invoicing and budget controls, with the right user licenses and an Optimize quote when financial profitability and approvals are required.

Official dollar annual rate card: Basics $9.99/user/month, minimum 3; Accelerate $24.99, minimum 5. Optimize and Enterprise require a quote. Month-to-month amounts were not independently verified; Desk is separate.

Strengths

  • Free client licenses on paid plans, within their project and permission limits
  • Accelerate connects user rates, time budgets and basic invoices
  • Optimize adds financial budgets, resource scheduling and profitability

Watch for

  • Free client users are limited to 5 active projects in their external company
  • Collaborators cannot log time; working contractors may require paid seats
  • Profitability needs a custom-priced tier, and financial access requires careful permissions
Read full review

Decision table

Where each tool wins

ClickUp vs Teamwork: feature boundaries and conditional recommendations
FactorClickUpTeamworkWinner
Main buying decisionConfigurable delivery workspace plus a verified finance processClient project workflow with progressively deeper financial controlsChoose the operating model, not a feature count
Current paid plansCore, Business, Enterprise and MAX; legacy accounts differBasics, Accelerate, Optimize and EnterpriseDo not reuse old Unlimited/Grow/Scale price tables
Five staff + twenty commenting clientsCore $81/month equivalent; Business $85 at annual ratesBasics $49.95; Accelerate $124.95 at annual ratesSeat budgets only, not feature-equivalent packages
Free client accessUnlimited view-only guests; interactive guests use an allowancePaid-plan client licenses are free, with a 5-active-project limitSeparate reading, commenting and doing work
Contractors tracking timeEligible external guests need edit access and tracking enabledCollaborators cannot track time; price appropriate standard licensesBudget actual roles, not every outsider as a client
Billable timeAdvanced feature: Core trial; Business 100 uses in current help matrixBillable tracking on all plans; rates and invoices require Accelerate+Unlimited timer is not unlimited billing workflow
Timesheet approvalsNot included on new Business; higher-plan entitlement needs verificationOptimize or EnterpriseA trial is not an ongoing entitlement
Financial budgets and profitSeparate finance system or a validated custom integrationOptimize or Enterprise; custom quoteDo not quote Accelerate as full profitability
Internal communicationUse separately permissioned internal contentMessage privacy exists; replies inherit it and owner-company admins override itCheck the client's real view before sharing
Automation allowanceCore 1,000/month; Business 10,000/monthBasics 5,000/month; Accelerate 20,000/monthCounting rules and supported actions still matter
Data exitTask CSV, individual Docs/files and time-entry exports are different jobsTask reports, time reports and MySQL archive are different jobsReconcile records and permissions, not just file downloads
AI budgetNew plans include allowances, not unlimited use of every AI featureIntroductory inclusion; usage-based credits announced for November 2026Obtain the renewal and usage quote

Best-fit buyer profile

Which tool fits your team better?

The winner depends on workflow maturity, team size, budget, and how much structure your team can maintain after the trial ends.

Choose ClickUp if...

Delivery work needs configurable task structures, docs and different cross-project views.
Eligible external guests fit the calculated allowance and internal staff are counted as paid users.
The exact advanced time-tracking, export and approval limits have been accepted after trial.
An existing finance tool or maintained integration owns rates, expenses, invoices and reconciliation.

Choose Teamwork if...

Clients should collaborate directly on their own projects within the free-license access limits.
Time budgets, rate application and invoicing should connect to the project record.
An Optimize quote is acceptable when financial profitability, resource scheduling or approvals are mandatory.
Working contractors, sensitive financial permissions and importer limitations have been budgeted and tested.

In this comparison

The Short Answer: Delivery Flexibility or Client Financial Control?Current Pricing: New ClickUp Plans and Teamwork's Quote-Only TierBase Subscription Budgets: Compare Equal Headcount FirstGuest Pricing: Five Staff and Twenty Clients Is Not Five Seats EverywhereClient Users and Contractors: Free Access Has Job BoundariesClient Permissions: Keep Internal Discussion and Costs SeparateTime Tracking Limits: A Timer, Billable Tags and Approvals Are DifferentFrom Tracked Hours to Invoices: Which Steps Are Actually Included?Worked Profit Example: Billable Value Is Not Collected CashRetainers: An Hours Allowance Is Not a Financial Revenue ScheduleWorkload, Templates and Automations: Measure the Real Delivery ProcessAI and Renewal Costs: Included Does Not Mean UnlimitedExports: Preserve Entries and Files, Not Only Dashboard TotalsMigration in Both Directions: What the Importers Actually PreserveA Practical Agency Pilot Before an Annual CommitmentFinal Recommendation: Buy the Workflow You Can ReconcileDecision checklistCommon mistakesMigration questions

The Short Answer: Delivery Flexibility or Client Financial Control?

Choose ClickUp provisionally when the agency's hardest problem is coordinating different kinds of work: production tasks, internal documentation, account-manager views and repeatable delivery processes. Choose Teamwork provisionally when the missing connection is between a client project, the time spent delivering it, the agreed budget and the invoice. Those are different reasons to buy. A task board with a timer does not automatically provide a dependable project-profitability system, and a finance-focused platform does not eliminate the need to design good delivery workflows.

For a small agency, the deciding questions are often more specific than ClickUp vs Teamwork overall. Can twenty clients comment without twenty full subscriptions? Can a freelance designer record hours without seeing another client's work? Does a fixed-fee project report the agreed fee or only the billable value of hours? Will a time export preserve the entries needed to explain an invoice? This comparison follows those questions through the current plans instead of naming a universal winner from feature counts or unsupported satisfaction scores.

Official pricing and documentation reviewed October 30, 2026 form the evidence for this comparison; no hands-on workspace, client-permission, invoicing, AI-accuracy or migration tests were performed. Calculations are illustrative reference budgets, not observed invoices. The dollar-denominated prices below are used as USD reference inputs before tax, currency conversion, discounts, extra services and implementation labor. Use the ClickUp review and Teamwork review for background, and the dated primary sources here for current plan boundaries. The agency project-management shortlist covers the wider buying decision.

Close-up of hands typing on a laptop at a desk with a second monitor
A delivery workflow must fit the people doing the work as well as the reporting requirements. Illustrative workplace photography, not a ClickUp or Teamwork product demonstration.Photo: Glenn Carstens-Peters / Unsplash.Illustrative laptop work, not a product screen or observed software test. Free Unsplash license verified October 30, 2026.

Current Pricing: New ClickUp Plans and Teamwork's Quote-Only Tier

The current ClickUp pricing page lists Core at $9 per user/month billed yearly and Business at $17. Switching the public page to monthly billing showed $12 and $25 respectively. MAX is $100 on the annual basis or $120 monthly, while Enterprise is quoted. The annual amounts are monthly equivalents, not subscriptions you can pay one month at a time. A five-seat Core annual base is $540 for twelve months; the five-seat monthly option is $60 per month before any billable guest expansion.

Existing customers should not assume their next invoice already uses that rate card. ClickUp's transition guide says new Workspaces start on the new plans, while certain existing Workspaces are being upgraded gradually. Applicable price changes occur at the stated renewal and begin no earlier than January 2027, not automatically mid-term. Account-team customers and existing Everything AI purchases have separate treatment. Check the owner's notice and Upcoming Bill rather than use a new-customer calculator to predict a legacy contract.

Teamwork's official text pricing page lists Basics at $9.99 per user/month billed annually and Accelerate at $24.99; Optimize and Enterprise require a sales quote. The standard HTML pricing route returned a page-not-found response during this review, so these figures come from the vendor's own published text rate card, cross-checked against its current feature matrix. We did not independently verify month-to-month Teamwork prices and do not reverse-calculate them from an approximate discount percentage. Confirm the currency, monthly alternative, annual invoice and renewal terms before purchase.

Teamwork Basics has a three-user minimum and Accelerate a five-user minimum. Its feature matrix also lists a five-user Optimize minimum, while the pricing text says to contact sales for that tier's user terms; the written quote should settle the commitment. Legacy Deliver, Grow and Scale pages are not the current new-customer rate card. Teamwork Desk is a separately licensed help-desk product, not automatically included because an agency wants to receive client emails. Keep these distinctions in the software evaluation checklist alongside the required features.

Dollar list prices reviewed October 30, 2026. Annual figures are monthly equivalents, not monthly-payment offers. ClickUp's billing toggle was checked; Teamwork rates come from its official text rate card. Taxes, extras, negotiated terms and currency conversion are excluded
PlanPer user/month, annual billingMonth-to-month priceMinimum paid seatsImportant boundary
ClickUp Core$9$12One owner is the first paid memberBasic tracking unlimited; advanced tracking and List exports are trials
ClickUp Business$17$25One owner is the first paid memberLarger guest allowance; new-plan approvals not included
ClickUp MAX$100$120Confirm account termsEnterprise-grade controls and higher AI allowances; not a default agency requirement
Teamwork Basics$9.99Not independently verified3Client collaboration and tracking; no user rates or invoices
Teamwork Accelerate$24.99Not independently verified5Time budgets, user rates and basic invoices; not financial profitability
Teamwork OptimizeCustom quoteCustom quoteMatrix lists 5; confirm quoteFinancial budgets, profitability, scheduling and approvals
Enterprise plansCustom quote from each vendorCustom quoteContract-specificCompare actual controls and services, not the shared plan name
A person writing a checklist in a squared-paper notebook with a black pen
Write down required roles, billing assumptions and export checks before an annual commitment. Illustrative checklist photograph, not a record of software tests performed for this comparison.Photo: Glenn Carstens-Peters / Unsplash.Illustrative handwritten checklist, not a record of a performed product trial. Free Unsplash license verified October 30, 2026.

Base Subscription Budgets: Compare Equal Headcount First

Before adding clients or freelancers, calculate the base subscription for the same internal team, including the owner. At two internal users, ClickUp Core is $18 per month equivalent on an annual plan and Business is $34. Teamwork Basics costs at least $29.97 because three seats are required; Accelerate costs at least $124.95 because five are required. That is $216, $408, $359.64 and $1,499.40 respectively over twelve months. These amounts intentionally exclude interactive guests, so they are a starting point rather than the final agency quote.

At five internal users, annual-basis monthly equivalents are $45 for Core, $85 for Business, $49.95 for Basics and $124.95 for Accelerate. At ten users they become $90, $170, $99.90 and $249.90. Comparing equal headcount prevents an inexpensive two-person ClickUp quote being placed beside a five-seat Teamwork commitment without explanation. It does not make the products feature-equivalent: Basics does not include financial budgets, and ClickUp Business does not establish an unlimited billable-time approval workflow simply because the public page lists Timesheets.

Annual billing reduces the displayed monthly equivalent but commits more cash. Teamwork's billing description says annual subscriptions are prepaid and run for the full term; cancellation does not imply a prorated refund of all remaining months. ClickUp upgrades apply to the entire Workspace, not only the one manager who wants a premium report. Include overlapping subscriptions during migration, configuration time, training and any accounting connector. The SaaS spending guide explains why the cheapest base tier is not necessarily the cheapest working system.

USD reference monthly equivalents with annual billing. Internal users include the owner; no clients or contractors are included yet. Teamwork's 3-seat Basics and 5-seat Accelerate minimums apply. These are base costs, not feature-equivalent packages
Internal usersClickUp CoreClickUp BusinessTeamwork BasicsTeamwork Accelerate
2$18$34$29.97$124.95
5$45$85$49.95$124.95
10$90$170$99.90$249.90

Guest Pricing: Five Staff and Twenty Clients Is Not Five Seats Everywhere

ClickUp distinguishes free view-only guests from permission-controlled guests who interact with shared content. According to its user-role pricing rules, Core includes five interactive guest seats for the first member and two more for each additional member; Business includes ten initially and five per additional member. With five paid members, that is thirteen Core guests or thirty Business guests. The owner counts as the first member. Unlimited view-only guests are a different allowance and do not provide free commenting or editing.

When the interactive allowance is exhausted, inviting another such guest automatically adds a paid member seat and increases guest capacity. The resulting open member seat can be filled by a later member invitation. This is why multiplying each excess guest by the full subscription price is also wrong. For five staff plus twenty commenting clients, Core starts with thirteen guest seats and needs four extra paid seats to cover the seven-guest shortfall. Nine paid seats cost $81 per month equivalent, or $972 annually. Business's thirty included guests cover the same twenty clients at five paid seats: $85 equivalent, or $1,020 annually.

The difference can reverse at a larger client audience. Ten staff plus forty interactive clients require nineteen Core paid seats: twenty-three guests are initially included and nine additional paid seats cover the seventeen-guest shortfall. Core becomes $171 per month equivalent, versus Business's $170 with fifty-five included guest seats. This is a narrow seat-cost crossover, not a claim that Business includes every financial feature an agency needs. Audit actual roles before upgrading; removing a client or changing a role should not be assumed to refund a prepaid seat automatically.

Under the same five-staff, twenty-client scenario, Teamwork Basics is $49.95 equivalent and Accelerate is $124.95, provided every client qualifies for the free client license and stays within its project allowance. A client merely reviewing a status page may need a different setup from one assigning work. In either product, count distinct people and the permissions they require, not the number of client companies. A single company with ten reviewers is ten users; one reviewer across several projects is still one person whose access scope needs checking.

Annual USD reference seat budgets. Staff includes the owner. All clients are distinct external people who need comment access; no contractors, taxes or add-ons. Teamwork clients each stay within 5 active projects in their client company. ClickUp extra seats increase guest capacity; no existing spare seats are assumed
Audience / planInitial interactive guest capacityExtra paid seatsTotal paid seatsMonthly equivalent12-month subtotal
5 staff + 20 clients / ClickUp Core1349$81$972
5 staff + 20 clients / ClickUp Business3005$85$1,020
5 staff + 20 clients / Teamwork Basics20 qualifying client users are free05$49.95$599.40
5 staff + 20 clients / Teamwork Accelerate20 qualifying client users are free05$124.95$1,499.40
10 staff + 40 clients / ClickUp Core23919$171$2,052
10 staff + 40 clients / ClickUp Business55010$170$2,040

Client Users and Contractors: Free Access Has Job Boundaries

ClickUp's guest policy says people using the organization's email domain or SSO cannot be added as guests. Eligible existing permission-controlled guests meeting those criteria become limited members, charged at the member subscription rate. A limited member is therefore not a synonym for a free client. An outside contractor with an agency-domain mailbox can change the budget even if their actual work is identical to another contractor's. Do not choose an artificial identity arrangement just to make a pricing example fit.

Teamwork client users are a free license type on paid plans for people who contract work from the agency, not its internal staff. They belong to an external client company and can be added to a maximum of 5 active projects associated with that company. Unlimited client licenses therefore does not mean unlimited active project access for each client. They can collaborate on permitted project items, but are not project administrators or general-purpose internal users. A client-only reviewer of proofs may not need a client license at all.

Teamwork collaborators are also free, but their role is different. They can comment and complete tasks or milestones assigned to them. They cannot edit task properties such as dates and assignees, create project items, or log or view time. The blanket claim that a collaborator cannot complete any task is incorrect. Equally, a collaborator who can tick off a deliverable is not a fully equipped freelance contributor if you need their logged hours in project costs.

Consider five staff, twenty clients and eight outside contractors who must edit assigned work and track time. On ClickUp, all twenty-eight outsiders fit Business's thirty-guest allowance if their identities and permissions qualify; Core needs thirteen paid seats and costs $117 per month equivalent. In Teamwork, budget thirteen standard users for staff plus working contractors, with clients remaining free: $129.87 on Basics or $324.87 on Accelerate at annual rates. The comparison assumes contractors are not misclassified as customers and does not claim that the cheaper option supplies identical billing, approval or profit features.

Five staff + twenty clients + eight external contractors. Contractors need task editing and basic time tracking. ClickUp outsiders all qualify as permission-controlled guests; Teamwork contractors are standard paid users, not clients. Annual USD rates, before tax/extras; advanced billing and approvals remain separate requirements
PlanPaid seatsExternal-user treatmentMonthly equivalent12-month subtotal
ClickUp Core1328 interactive guests; 8 extra member seats add capacity$117$1,404
ClickUp Business528 interactive guests fit the included 30$85$1,020
Teamwork Basics135 staff + 8 contractors paid; 20 eligible clients free$129.87$1,558.44
Teamwork Accelerate13Same user mix; rates/time budgets/basic invoices included$324.87$3,898.44

Client Permissions: Keep Internal Discussion and Costs Separate

ClickUp guests receive access to selected content, not an entire Space. Its permissions documentation explains inheritance through Folders, Lists and tasks, with more specific permissions and multi-List sharing affecting access. An internal task added to a second, client-visible List can acquire a wider audience than its original location suggests. A filtered view is useful for presentation, but filtering is not a substitute for access control. Review tasks, attached Docs, linked relationships and shared Dashboards from the client's identity.

The reviewed ClickUp permission docs do not establish an internal-only switch for individual comments inside a client-visible task's ordinary discussion. Use separately permissioned internal tasks or Docs for internal estimates and negotiation notes; do not assume a thread or an assigned comment creates privacy. Teamwork explicitly documents message privacy: new messages default to everybody on the project, replies inherit the original message's privacy, and owner-company site administrators retain access. That is a specific messaging control, not proof that every item is private by default.

Financial visibility needs its own review. Teamwork's permission matrix and rate guide distinguish site-wide cost rates from project billing, budget and profitability permissions. Detailed cost-based figures can allow someone to infer a person's cost rate even if a rate field is hidden. The client-license guide and broader permission tables also describe different restrictions around profitability panels and project permissions; do not resolve that by assuming all clients either can or cannot see every financial figure. Verify the actual page, user role and project permission together.

A useful permission rehearsal uses two fictional clients, one contractor and one finance manager. Share only Client A's delivery items, attach one internal document, create a private message, and try the direct links while signed in as Client B and as the contractor. Check email notifications and exported reports as well as the screen. The required outcome is no unauthorized project content or internal costs, not simply a cleaner-looking dashboard. This is a proposed acceptance check, not a security test we performed on either vendor.

Time Tracking Limits: A Timer, Billable Tags and Approvals Are Different

ClickUp's current time-tracking feature matrix lists one hundred basic time-tracking uses on Free Forever and unlimited basic tracking on Core and Business. The basic category includes creating, editing and deleting entries. Advanced tracking is a separate category covering descriptions, tags, billable marking, certain Timesheet operations and time unconnected to a task. Core lists a trial; Business lists one hundred uses. Do not turn the pricing-page phrase Time Tracking into a promise of unlimited advanced billing features.

The same matrix says timesheet approvals are not included on new Business plans; existing Business plans have a one-hundred-use allowance, and higher-plan availability is listed separately. It also contains a temporary unlimited-usage trial notice, so access during an evaluation does not prove permanent entitlement. Ordinary feature usage allowances do not reset like monthly automation or AI-credit allowances. Time created through integrations or ClickUp AI counts toward tracking limits too. If approval and sustained billable tagging are essential, obtain the entitlement for your exact plan and ask what happens after the trial ends.

ClickUp guests can track time when an owner or admin enables it for them and they have edit or full-edit access to the task. Comment-only access is not sufficient. Its approval workflow locks entries on submission and permits changes through the review/reopen process, but owners and admins can edit locked and approved entries. Treat that as an operational approval control, not an immutable ledger. A paid entitlement, an authorized role and the correct task permission all have to be present.

Teamwork's current plan matrix includes time tracking and billable time on all tiers, but user rates, personal/company timesheets and basic invoices begin on Accelerate. Timesheet approvals require Optimize or Enterprise. Its Time report also has inclusion rules: tasks need an individual assignee, a start or due date, and recorded time or an estimate. A missing task in that report does not prove no work happened. Reconcile report totals with the underlying time records and check how undated, unassigned and project-level work is represented.

Documented plan boundaries checked October 30, 2026. Temporary trials and legacy contracts can differ. An available trial control is not proof that ongoing usage is included
RequirementClickUpTeamwork
Basic create/edit/delete time entriesFree: 100 uses; Core and Business: unlimitedTime tracking listed on all plans
Advanced billable-time workflowCore: trial; Business: 100 advanced uses in the current matrixBillable time on all plans; user rates from Accelerate
Timesheet approvalsNot included on new Business; existing Business and higher plans have separate rulesOptimize or Enterprise
Contractor time entryEligible guest with task edit/full-edit access and tracking enabledCollaborators cannot log time; choose an appropriate license
Time budgets and basic invoicesSeparate or validated custom finance processAccelerate or higher
Financial budgets and project profitabilityNo equivalent native lifecycle established in the reviewed sourcesOptimize or Enterprise, custom-priced

From Tracked Hours to Invoices: Which Steps Are Actually Included?

An hourly billing workflow has several steps: record time, decide what is billable, approve exceptions, apply the correct rate, add agreed expenses, issue an invoice and reconcile payment in accounting. ClickUp's time-reporting documentation supports reporting and exports; it does not establish an equivalent native rate-history, financial-budget and invoice lifecycle for this comparison. A custom money field or a formula named Profit can help a team, but only after someone defines and maintains the data model behind it.

Budget a separate finance system or a validated integration when using ClickUp for delivery. Establish who owns the rate table, how historic rates survive changes, which expense rows are included, and how an invoiced time entry is prevented from being billed again. A connector subscription is only one cost: mappings, retries, duplicate protection and reconciliation need an owner. The Harvest vs Clockify comparison covers a separate time-to-invoice shortlist. QuickBooks vs Xero answers the accounting-side question rather than pretending either project tool replaces a general ledger.

Teamwork Accelerate includes user rates, time budgets and basic invoices; Optimize adds financial and fixed-fee budgets, deeper invoice controls and profitability. Its invoice guide distinguishes fixed-price invoices from time-and-expense invoices. Time logs added to an invoice are marked invoiced and cannot be edited until removed from it. That helps define a billing handoff, but sending an invoice is still not proof that a customer paid. Check the chosen accounting integration's direction, customer mapping, invoice numbers and tax treatment before relying on synchronization.

Teamwork's rate precedence is also meaningful: project billable rates override other billable rate types; client-role rates can override standard role rates, which override site-wide user billable rates. Cost rates remain the user's site-wide cost rate rather than a separately defined cost for every project. An agency that pays a contractor a different cost for different engagements should test that requirement explicitly. Do not assume the existence of project billable-rate overrides means project-specific cost-rate overrides are available too.

Worked Profit Example: Billable Value Is Not Collected Cash

Use a synthetic project with sixty billable hours, ten non-billable hours, a $125 billable rate, a $50 cost rate for all seventy hours, and $500 of project expenses. Billable value is $7,500. Labor cost is $3,500, so delivery cost including expenses is $4,000. The difference is $3,500, or a 46.67% margin on billable value. Omitting the ten non-billable hours falsely increases the apparent profit by $500. These calculations illustrate the fields a dependable finance workflow needs; they are not measurements of either software's output.

Now suppose the contract is a fixed $9,000 fee. On that agreed-fee basis, the same $4,000 delivery cost leaves $5,000, a 55.56% contribution margin before overhead and tax. The signed fee, billable value, invoice amount and collected cash are four different numbers. Teamwork's Profitability report documentation calculates revenue for standard and repeating budgets from billable hours multiplied by rates. Its retainer calculation follows a different rule. Ask which view matches the contract instead of assuming every report automatically uses the fixed amount written in the proposal.

For either tool, check the reporting period and the underlying entries before comparing margins. A cost-rate change, unlogged revision round or expense outside the selected date range changes the result. The Teamwork report only includes projects with time logged in its selected period, and changes to a rate apply to the entire day on which that rate is set or updated. A missing project is not necessarily a zero-revenue project. None of these project-level figures should be presented as company net profit without allocating the additional business costs and following the agency's accounting policy.

Synthetic project, not product-test output: 60 billable + 10 non-billable hours, $125 billable rate, $50 cost rate for all hours, $500 expenses. Company overhead and tax excluded. The fixed-fee alternative changes the revenue basis, not the cost
MeasureCalculationResult
Billable value60 hours x $125$7,500
Labor cost70 hours x $50$3,500
Total delivery cost$3,500 labor + $500 expenses$4,000
Contribution on billable value$7,500 - $4,000$3,500
Margin on billable value$3,500 / $7,500 x 10046.67%
Alternative fixed-fee contribution$9,000 agreed fee - $4,000 cost$5,000
Alternative fixed-fee margin$5,000 / $9,000 x 10055.56%
Cost hidden by omitting non-billable hours10 hours x $50$500

Retainers: An Hours Allowance Is Not a Financial Revenue Schedule

Teamwork Accelerate includes time-based retainer budgets, while financial retainer budgets require Optimize or Enterprise under the current matrix. That distinction matters for an agency selling forty hours per month versus an agency selling a fixed recurring service fee. An hours allowance helps control delivery effort; a financial budget supports a different commercial question. Ask whether unused time carries forward, how overruns are approved, and what happens when the renewal period is shortened. A repeating task template does not answer those questions by itself.

For retainer projects, Teamwork's profitability documentation distributes the retainer fee pro rata across the budget period. As an original illustration, a $9,000 fee over thirty days allocates $300 per day and $3,000 to a ten-day reporting slice. If eligible delivery cost in that slice is $2,200, the difference is $800. That is an operational allocation example, not a prediction that a $3,000 invoice was sent or collected. User-level revenue calculations are not provided for individuals on retainer projects, so do not expect their revenue rows to reproduce the project fee allocation.

With ClickUp, recurring tasks and project views can organize retainer deliverables, but the reviewed finance documentation does not establish the same native financial-retainer calculation. Keep the contract, period boundaries, time-entry IDs and finance records connected through a defined external process. In a pilot, include a mid-month start, an unbilled revision and a task carried into the next period. The acceptance question is whether the team can explain the period's allowance, cost and invoice without manually inventing missing history at month-end.

Workload, Templates and Automations: Measure the Real Delivery Process

ClickUp's hierarchy and views suit agencies that need several perspectives on the same work: a designer's queue, an account manager's client portfolio and an internal operations list. Decide where a client, project and deliverable live before creating templates. A separate status system in every List may feel flexible but make cross-project reporting harder to maintain. Teamwork organizes work around clients and projects and now lists unlimited project templates on paid plans. Claims that all paid Teamwork plans have only a small fixed template allowance should be checked against the current matrix, not repeated from older comparisons.

Workload planning is not identical to resource scheduling. Teamwork lists its Workload Planner on Accelerate, while scheduling across projects and people, placeholders, public holidays, time off and skills management begin on Optimize. ClickUp Business lists Resource Management, but that label is not evidence that every detailed Teamwork scheduling function has an exact equivalent. Test one person split between two client projects, a half-day absence, a tentative proposal and a late dependency. A task-count chart and an hours-based availability forecast answer different questions.

Published automation allowances also differ: ClickUp Core lists 1,000 monthly automations and Business 10,000; Teamwork Basics lists 5,000 monthly actions and Accelerate 20,000. These numbers are not throughput benchmarks and do not prove that the same workflow consumes the same units. Verify the supported trigger, each action, integration entitlement, failure behavior and reset rules. Run a small representative sequence and check its usage counter before projecting a busy month. For cross-app orchestration, the Zapier vs Make comparison addresses a separate subscription rather than an invisible free extension of the project plan.

Keep the pilot representative rather than elaborate: one repeatable project template, clear owners, realistic estimates and the status transitions used in daily work. Measure whether staff can find their next action and whether a manager can identify blocked work without rebuilding views. We did not measure interface speed, onboarding time or adoption in either product, so no numeric productivity advantage is assigned. If the main need is software issue tracking rather than client finance, use Linear vs Jira as a more relevant comparison.

AI and Renewal Costs: Included Does Not Mean Unlimited

ClickUp's new plans bundle AI allowances rather than simply adding the old Brain subscription to every new plan. The public rate card describes pooled monthly credits and different model access, with credit top-ups priced separately. Core's premium-model access is a trial. Enterprise and MAX have different allowances and controls from Core and Business. Do not add an obsolete per-user AI add-on to a new-plan budget, but do not assume every meeting, agent or premium-model interaction is unlimited because the plan includes AI.

Teamwork's official text pricing page states that AI is included for an introductory period and usage-based AI credits are scheduled to launch in November 2026. This review is dated October 30, so that announced change is directly relevant to a new annual buyer. Future credit rates and a customer's actual consumption are not established here; ask for the allowance, top-up rules and renewal treatment in writing. Teamwork Desk's Dotty add-on is separate again. A comparison that prices every AI workflow at zero for the next twelve months would overstate what the current source proves.

AI should be evaluated after roles, timesheets and financial definitions work without it. A generated project summary cannot fix missing hours or determine whether a private client document may be shared. Use fictional or approved data for the pilot, verify the connected-source permissions, and require review of financial outputs before invoicing. No AI accuracy, confidentiality certification or provider-retention guarantee was tested for this article. A feature can save useful effort without becoming the authority for the amount a client owes.

Exports: Preserve Entries and Files, Not Only Dashboard Totals

ClickUp offers different export paths. Its Workspace export overview describes task CSVs with properties, comments and attachment hyperlinks, individual Doc exports, and attachment downloads. A hyperlink is not the file itself, and bulk export of every Doc is not documented as available. Its export entitlement matrix says Core List-view exports are a trial and Core does not include Table or Form-view exports; this does not mean that the separate owner/admin Workspace task export disappears.

For List and Table exports, collapsed groups are omitted and subtasks need the appropriate display option. Download links expire after one hour. Separately, time-card exports include Time Entry ID, user, billable status, start/stop details and duration, subject to card-export entitlement. Preserve those identifiers and confirm whether the chosen format uses decimal hours, clock time or milliseconds. A task's total time cannot reconstruct each person's dated, billable entries.

Teamwork's task-list report guide documents CSV, Excel and PDF routes with different contents: comments can be included in PDF, while custom fields are supported in the Excel report. That is not a promise that a task CSV preserves both. The guide is older than the current plan matrix, so verify a sample export from the exact account. For time reconciliation, use time records/reports with the intended period and filters, and check entries that a summary report's inclusion rules might omit.

Its MySQL backup is a raw database archive generated at most once per day. Items created before the selected start date are excluded. Teamwork describes it as an offline archive, not an editable spreadsheet or a file you can upload back to modify the site. A successful ZIP download does not establish a complete cross-platform restore, original-file portability or matching permissions. Retain the source while checking file access, invoices, time-entry totals and the records needed for audit; protect exports because they can contain more than one client's information.

Migration in Both Directions: What the Importers Actually Preserve

ClickUp's general import directory mentions Teamwork, but its specific Teamwork transition guide explicitly says there is no official direct Teamwork importer and directs users to CSV import. That specific instruction is more useful than assuming a platform name in a list means a complete native migration. Map clients, projects, task lists, statuses, assignees and dates, then separately account for comments, attachments, time history, budgets, invoices and permissions. The guide's suggestion of an online file converter is not a reason to upload confidential client archives to an unapproved third party.

The reverse direction has a documented ClickUp importer in Teamwork, but it is not a complete workspace copy. Folder-less Lists are skipped. Spaces become project categories, Folders become projects, Lists become task lists, and checklist items become subtasks. Folder statuses, custom fields and attachments are not carried over. Top-level comments can transfer, but comment replies do not. Preserve the missing files and conversation context separately, and check where your client/project structure will land before importing.

User mapping can change both permissions and the invoice. ClickUp full members are created as collaborators in Teamwork's owner company; those collaborators cannot log time until an appropriate license is assigned. Imported task assignees receive access to the associated project, so task-level access should not be assumed to remain task-only. Teamwork's reimport instructions require deleting the existing destination project first; archiving it does not turn reimport into an update. Do not use that destructive route on an active destination project without a backup, approval and a plan for changes made since the first import. Historical time, rates, invoices and permission fidelity still require separate reconciliation.

Use one closed project and one active project as a controlled sample. Reconcile task and subtask counts, original identifiers, completed items, time entries by person/date/billable status, expenses and the files referenced by invoices. Verify timezone handling with an entry near midnight. Choose a cutover owner and a final change window; keep notifications and integrations from writing duplicate updates in both systems. Preserve a read-only history or approved archive until accounting and client-access checks pass, then cancel only the subscriptions and integrations actually being replaced.

Documentary migration checks, not a performed transfer. Confirm with a controlled sample before moving client data. A native importer, a CSV and an offline archive preserve different things
Record or boundaryTeamwork to ClickUpClickUp to Teamwork
Import routeClickUp's specific guide recommends CSV, not a direct Teamwork importerDocumented importer for owner-company site admins
HierarchyMap clients, projects, task lists and statuses deliberatelyFolders become projects; Lists outside Folders are skipped
Comments and filesTask report comments are PDF-only; download files separatelyAttachments and comment replies are not carried over
Custom fields and statusesValidate export format and destination field typesCustom fields and Folder statuses are not carried over
Users and accessRebuild user mapping and client permissionsFull members become collaborators; assignees receive project access
Time and financial historyReconcile individual entries, rates, budgets and invoices separatelyFull financial/time-history fidelity is not established by the import guide
Retry and cutoverAvoid duplicate rows; keep source and a final change windowReimport requires deleting the destination project, not merely archiving it

A Practical Agency Pilot Before an Annual Commitment

The pilot below is a proposed acceptance plan, not a set of results. Use the same fictional users and project in both products, record the exact plan and whether trial features are active, and keep a copy of the quoted subscription. Include a client who comments, a client who only reads, a contractor who tracks time, an internal manager and a finance reviewer. A trial configured only as the owner misses the access and billing boundaries most likely to affect a real agency.

Run the project through a revision cycle and a billing boundary, not just task creation. Change an estimate, log non-billable rework, correct a submitted time entry, add an expense and export the relevant records. The finance reviewer should explain the difference between contract fee, billable value, invoiced amount and payment received. The client should see only the agreed delivery information. Record anything requiring a higher plan, paid seat, custom automation or manual spreadsheet so it appears in the purchase decision rather than after onboarding.

Compare the completed workflow and the team's maintenance burden with the evaluation checklist. A small agency may rationally choose a separate time/accounting tool alongside ClickUp, while another may prefer an Optimize quote to reduce handoffs. Neither decision needs a fabricated total score. The result should be a dated, explainable recommendation with known costs and unresolved requirements, not a claim that a software subscription alone makes projects profitable.

Proposed acceptance checks using fictional or explicitly approved data. No workspace, security, billing or migration pilot was performed for this article
CheckTest inputRequired outcome
Seat quoteOwner, staff, commenting clients and working contractorsRecorded paid-seat count and annual invoice match the chosen roles
Guest boundaryView-only client starts commenting; interactive allowance is exhaustedPermission and billing changes are understood before the invitation
Client separationTwo client identities, direct links, attached internal documentNeither client receives the other's content or internal financial data
Contractor workflowExternal person edits a task, completes it and logs timeTheir actual license supports all required actions
Time entitlementBasic entry, billable marking and submitted timesheetExact post-trial plan entitlement is documented for each action
Invoice reconciliationBillable work, non-billable revision, expense and corrected entryApproved entries reconcile once, without duplicate billing
Retainer periodMid-month start, carryover request and late time entryAllowance, financial allocation and invoice basis remain explainable
Resource planTwo client assignments, a half-day absence and tentative workThe report reflects the intended hours and availability, not task count alone
Migration sampleClosed and active projects with subtasks, replies, files and custom fieldsOmissions, user-role changes and access widening are identified
Export and cutoverIndividual time entries, source IDs and a near-midnight recordCounts, timezones, files and required financial history reconcile before cancellation

Final Recommendation: Buy the Workflow You Can Reconcile

Choose ClickUp when delivery flexibility is the priority, the real guest count is economical, and an approved finance process covers the limits of the chosen plan. Business can cost almost the same as Core for a client-heavy agency because of guest capacity, but its basic timer, advanced time features and approvals still need separate verification. Choose Teamwork Basics for eligible client collaboration and tracking; consider Accelerate for time budgets, rates and basic invoicing. Request Optimize when financial budgets, profitability, resource scheduling or approvals are requirements, without assuming an old Scale price remains available.

For a very light task-and-docs workflow, ClickUp vs Notion asks a different question, and the ClickUp alternatives guide broadens the shortlist. For this agency comparison, the practical winner is the configuration that can explain its seat bill, preserve client boundaries and reconcile time with the contract and finance records. Confirm the current quote and trial-to-paid entitlements before signing. No performance, migration-completeness or business-profitability outcome is guaranteed by this documentary comparison.

Decision checklist

Record current versus legacy plan, currency, billing term, paid-seat minimum and renewal date.
Count staff, view-only clients, commenting clients and contractors separately, including their email/SSO classification.
Calculate ClickUp interactive guest capacity before assuming the employee count equals paid seats.
Confirm every Teamwork client user's active projects and whether contractors need standard licenses.
Obtain post-trial limits for billable tagging, Timesheets, approvals, exports and AI usage.
Specify whether the budget is in hours or money and how fixed fees, retainers and non-billable work affect reports.
Review client access to linked items, internal messages, cost-based figures and exported reports.
Reconcile a small project and its time entries, files and invoice history before committing annually.

Common mistakes to avoid

Comparing old Unlimited/Grow/Scale prices with current new-customer features.
Charging every ClickUp guest separately or treating all interactive guests as unlimited and free.
Calling Teamwork collaborators unable to complete assigned tasks, or assuming they can log time.
Treating unlimited client licenses as unlimited active projects for each client.
Assuming a basic timer, temporary trial or Timesheets label includes permanent billable tracking and approvals.
Equating billable value, a fixed contract fee, an issued invoice and collected cash.
Hiding a cost-rate field while giving the client enough financial data to calculate it.
Assuming imported collaborators, missing attachments and lost comment replies will repair themselves after cutover.

Migration questions before switching

Are all required ClickUp Lists inside Folders before a Teamwork import, and how will the hierarchy map?
Which comments, replies, custom fields and original files need a separate export or archive?
Will imported users become collaborators, and who needs a paid license to resume time tracking?
Does assigning an imported task expose a wider project than the person could previously access?
Can the finance owner reconcile time-entry IDs, billable status, rates, expenses and invoices by period?
How will destination changes be preserved if a reimport requires deleting an existing project?
Who owns the final change window, notification shutdown, retained source access and subscription cancellations?

Helpful Softora links

ClickUp ReviewTeamwork ReviewProject Management SoftwareAgency Project Management ShortlistClickUp AlternativesHarvest vs ClockifyClickUp vs NotionQuickBooks vs XeroSoftware Evaluation ChecklistSaaS Spending Guide

FAQs

Common questions about ClickUp vs Teamwork

Is ClickUp or Teamwork better for an agency?

ClickUp is a sensible shortlist for flexible delivery workflows, docs and cross-project views when a separate or validated finance process is acceptable. Teamwork is a sensible shortlist for project-linked time, budgets and invoicing. Basics and Accelerate do not include full financial profitability: Optimize or Enterprise is required for that workflow. The recommendation depends on roles, client volume and verified plan entitlements, not an unsupported overall score.

How much do five staff and twenty client users cost?

For twenty external clients who need comment permissions, ClickUp Core requires nine paid seats under its guest-capacity rules: $81/month equivalent, $972 annually. Business needs five paid seats: $85 equivalent, $1,020 annually. Teamwork Basics is $49.95 equivalent, $599.40 annually, and Accelerate $124.95 equivalent, $1,499.40 annually, assuming qualifying client licenses within their five-active-project limit. These are annual-list-price seat budgets before tax and extras, not feature-equivalent packages.

Are ClickUp guests free?

View-only guests are unlimited and free on paid plans. Permission-controlled guests use a plan allowance: Core starts with five for one member and adds two per additional member; Business starts with ten and adds five. Exceeding the allowance adds a paid member seat and more guest capacity. People using the organization's email domain or SSO cannot be treated as guests; limited members are paid.

Are Teamwork client users unlimited?

Paid plans include unlimited client licenses without adding to the subscription count, but each client user can access at most five active projects belonging to their external client company. They are not owner-company staff or project administrators. Unlimited license quantity should not be confused with unlimited project access or permission to see internal financial information.

Can Teamwork collaborators complete tasks and track time?

They can complete tasks and milestones assigned to them and add comments. They cannot log or view time, edit task properties or create project items. A contractor who needs those capabilities may require a standard paid license. Do not classify someone delivering work for the agency as a customer merely to use a free client license.

Does ClickUp Business include unlimited billable time tracking?

The current official matrix separates unlimited basic tracking from advanced features. Business lists one hundred advanced uses, including billable marking and certain Timesheet actions. Core's advanced access is a trial. The matrix also has a temporary unlimited-usage notice, so a successful trial does not establish permanent entitlement. Check the exact new or legacy plan before choosing it for ongoing billing.

Which plans include timesheet approvals?

Teamwork lists approvals on Optimize and Enterprise. ClickUp's current matrix says approvals are not included on new Business plans, distinguishes a one-hundred-use allowance on existing Business plans, and lists higher-plan availability separately. Temporary trial access and legacy terms can differ. Obtain confirmation for the account being purchased rather than treating a Timesheets feature label as an approvals entitlement.

Does Teamwork Accelerate include project profitability?

No, not under the current plan matrix. Accelerate includes time budgets, time-only retainer budgets, user rates and basic invoicing. Financial and fixed-fee budgets, project profitability and the Profitability report require Optimize or Enterprise. Current Optimize pricing is quote-based; an older public Scale price is not a verified current quote.

Can clients see internal costs or comments?

That depends on the item, user role and permissions. ClickUp's shared tasks should not be assumed to have internal-only comment threads; keep internal content separately permissioned. Teamwork message replies inherit the original message's privacy, with owner-company admin overrides. Detailed project financial data can reveal cost rates indirectly. Test the exact client's view, links, notifications and exports before sharing real data.

Is Teamwork to ClickUp migration automatic?

ClickUp's specific Teamwork transition guide says there is no official direct importer and recommends CSV import. Task rows do not establish transfer of comments, original files, individual time entries, rates, invoices or permissions. Reconcile a closed and an active project, and retain the source until the required history and access controls are verified.

Can I export ClickUp data on Core?

Core List-view exports are a trial and Table/Form-view exports are not included under the current export matrix. The separate owner/admin Workspace task export is a different permission and route, so this is not a blanket ban on taking data out. Task CSVs, individual Doc/file downloads and time-card exports have different contents and requirements. Verify the exact export needed before subscribing.

Will the new ClickUp prices immediately change my existing bill?

Not necessarily. ClickUp says applicable existing-workspace price updates happen at the stated renewal and begin no earlier than January 2027. Unchanged legacy accounts, account-team contracts and some existing AI purchases have separate treatment. Check the owner's email and Upcoming Bill notice. The published new-customer rates are not proof of an immediate mid-term increase.

Related comparisons

Keep comparing your shortlist

View comparison hub

Project Management

ClickUp vs Notion

ClickUp wins for structured project management and dashboards. Notion is better for docs, knowledge bases, and flexible workspaces.

Project Management

Linear vs Jira

Compare Linear vs Jira on free-plan limits, equal-team annual costs, workflow control, automation, permissions, and the data a Jira-to-Linear move may lose.

E-commerce Platforms

BigCommerce vs Shopify

Compare BigCommerce and Shopify on payment-provider fees, sales-based upgrades, staff access, B2B catalogs, product filters, and store migration limits.

Softora

Softora is an independent review site helping businesses find the right software without marketing noise. Every recommendation is backed by hands-on testing, pricing verification, and editorial review.

We cover CRM, project management, email marketing, AI tools, no-code automation, SEO, hosting, and more. No paid placements, no sponsored rankings - just honest, editorially independent evaluations.

Quick Links

  • Home
  • Categories
  • Reviews
  • Blog
  • Resources
  • Authors

Legal

  • Privacy Policy
  • Terms of Service
  • Disclaimer
  • Contact

Legal Disclaimer

Softora is supported by its readers. When you purchase software through links on our site, we may earn an affiliate commission. This never influences our editorial decisions or final scores. Our reviews are based on technical analysis and hands-on testing. Softora does not accept paid placements, sponsored rankings, or vendor-funded scores. All editorial content is produced independently by the Softora team. Pricing, features, and availability of the products reviewed on this site may vary and should be confirmed directly with each vendor before making a purchasing decision. Software products change frequently and the information published on Softora may not reflect the most recent updates from each vendor. We make every effort to keep our content accurate and current, but readers should always verify critical details such as pricing tiers, usage limits, contract terms, and feature availability directly with the software provider before committing to a purchase or annual subscription.

(c) 2026 Softora Media Group. Independent. Honest. Expert.